Description of this paper

Loading

ET2750 Project Part 2 Presentation: Design and Implementation of-(Answered)

Description

Step-by-step Instant Solution


Question

hey need help with all this assignment . I behind due to working long hours.


ET2750

 

Project Part 2

 

Presentation: Design and Implementation of an Industrial PLC Solution

 


 

Procedure:

 

1. Design and implement an industrial PLC solution. The flowchart created in Project Part 1 should

 

now be completed and used as a guide for the design.

 

2. Design deliverables should include, but not be limited to:

 

o

 


 

A clear and concise overview of the project

 


 

o

 


 

A summary of the findings and results

 


 

o

 


 

The number or programming units and their location:

 


 

o

 


 

The different types of input and output components, such as switches, sensors, and LEDs

 


 

o

 


 

The reasons for using internal/external power supplies (if they are being used)

 


 

o

 


 

The types of power supplies used

 


 

o

 


 

Address of each section of the final project documentation

 


 

o

 


 

Provision for expansion/integration

 


 

o The type of network protocol (if possible)

 


 

1

 


 

 

Paper#9255511 | Written in 27-Jul-2016

Price : $16
SiteLock